CATHODE RAY TOMES

VS Soccer

Vs. Soccer (set SC4-2 A) (Nintendo, 1985) · Document · 3 pages · 4 sections · original scan

Page 1

(Operation Manual)

MDS (MGS)

|. How to install Software ROMs

Each Software ROM is labeled with a Location Number shown on it ( NX Shaded Portion illustrated below), which indicates the corresponding location on the P.C. Board where it should be installed.

“Label on. Software ROM)

“VS.SOCCER” contains 6 Software ROMs and 1 Custom IC, which have location numbers, 1A or-6A, 1B or 6B, 1C or 6C, 1D or 6D, 2A or 8A, 2B or 8B and 2F or 8F. Each ROM and IC must be mounted into the proper IC Socket.

For VS.DUAL SYSTEM (two monitors): If “VS.SOCCER” is to be installed in main (left) side of cabinet, then EPROMs and Custom IC should use locations 1A, 1B, 1C. 1D, 2A, 2B ano 2F. For sub ‘right) side, use locations 6A, 6B, 6C, 6D, 8A, 8B and 8F.

For VS.UNISYSTEM (one monitor): “VS.SOCCER” EPROMs and Custom IC must use locations 6A, 6B, 6C, 6D, 8A, 8B and 8F ‘sub side).

POR A B C D &€ F H JK LM N

CAUTION: Make sure the Software ROMs and Custom ICs are inserted properly.

© SW1 corresponds to this program. g MAIN ‘Left side for two monitor game--Not used 7 for one monitor game. Nd3d-10-SaW ©

© between left anc rien: side on two

Page 2

2. Points and methods of adjustment

Game Option Settings MDS P.C. Board

SW1--MAIN (Left side for two monitor game- -Not used for one monitor game)

Swe---SUB (Rignt side for two monitor game--Aiso used for one monitor game) MDS FOR VS.SOCCER

Swicswe,

t)y2];a;4e4]a;eyr7qe i Coin ‘Credit 11] OFF J OFF ILOF 7 |

  • 2]OF= {OFF} ON | 4 3)OFF} ON [OFS i +-G]OF=1 ON | ON 2°41 ON |OFF OFF

3/1] ON JOFF) ON 41] ON | ON |OFF Free] ON | ON | ON \ INITIAL POINTS | | SETTING i

600 PTS.OFF OFFi

800 PTS. OFF} ON

1000 PTS.ON [OFS:
1200 PTS.ON | ON;

DIFFICULTY LEVEL EASY 1 offpff 2 off] on 3 on joff HARD 4 on jon i '

Page 3

(U.S.)

CAUTION

The suggested factory settings for VS. soccer™ are listed below. It is recommended

that you carefully check the dip switch settings prior to operation. For the vs. Dualsystem™ , the dip switch settings will be on either SWl or SW2, depending on which side of the P.C. Board you install,the EPRO{'s and custom I.C.. Refer to the operation manual for further instructions. For the VS. Unisystem™', the EPRM's and the custom I.C. must be installed in the "sub" side of the P.C. Board, and then SW2

is used.

(6) MOS A-COU i c

a

: Ls | : =x

ue

we op x5] 2 PL et a OFF o Rs ™ Hs < Eee mms @Q -« were

Please refer to the dip switch settings label and the vs.-Pak"™* Operation

Manual for further information.

Nintendo of America Inc.