xStation Installation Guide (PU-8 late)
PlayStation (Sony, 1994) · Installation Guide · 13 pages · 4 sections · original scan
©
Station
Installation Guide ©
LATE PU-8
xStation ODE installation guide for LATE PU-8 Playstation 1 motherboards
The LATE PU-8 mainboards can be found in: Most SCPH-1001 and SCPH-1002 Most SCPH-3000 Most SCPH-3500 All SCPH-5000
Why the mainboard called “LATE”, and is there an “EARLY”? Literally, yes! The PU-8 came in two major flavors (EARLY and LATE). You can check which mainboard you have by looking for these marks:
- Mainboard labels
- EARLY mainboards are labeled PU-8-11
- LATE mainboards are labeled PU-8-21/22/23 or 41
EARLY PU-8 LATE PU-8 labeled as: X-XXX-XXX-11 labeled as: X-XXX-XXX-23
Production and Sales i Guide by: ._ www.castlemaniagames.com ess seewood
- The GPU and especially the VRAM area on the top side of the mainboard is different, see picture below
RAN ie 2B
SONY
EARLY PU-8 LATE PU-8 2 VRAM blocks near the GPU 1 big VRAM block near the GPU
erent sizes, see picture below ja i T
EARLY PU-8& LATE PU-8 big Mechacon controller chip smaller Mechacon controller chip (on the right) (on the right)
Guide by: ss seewood ey Dev: Production and Sales By. www.castlemaniagames.com
When you are sure that you have a LATE PU-8 you can follow this guide.
- You have to disassemble the Playstation 1 completely to get to the mainboard. PLEASE REMOVE ALL CABLES FROM THE POWER SUPPLY. MAKE SURE THAT THE POWER CORD IS DISCONNECTED!
- Search for IC309
- 1309 is labeled CXD2510Q. You will find it in the upper left corner. See picture below
remember me in step 6
(Remember the purple area as well. We will get to it later in this guide. For now we'll focus on the red area.)
Production and Sales i < Guide by: . Www.castlemaniagames.com phe seewood %
- IC309 (CXD2510Q) needs to have the following pins lifted: 44, 63, 66 and 69. Please make sure that only the shown pins are lifted.
eho 6 Of 6? (ee ATMA ne EES = =— oo" heben Gi
Oo OOOb00 AvQaLlt9 cy ye A cea Pr Fe
Sie eer =o,
- Please be careful not to damage the mainboard when lifting pins. Use a needle or x-acto knife and a fine soldering tip to simply touch the pin and apply some heat, then gently lift it from underneath using the needle or blade.
a Se inninint — e (i . AvaaLlv9
BOLGZaxd 4NOS:
Dev: Production and Sales Guide by: fama Be _ www.castiemaniagames.com © seewood
- Please make sure that you have lifted the pins completely. They should not have contact with the motherboard, nor with each other.
AVG4ALt9
Ce WOCCEE SST ERUEEED se 20
- Now we'll get to the purple area on the mainboard top side. In this area you can see the 67mhz oscillator. You need to desolder/remove the small resistor and the filter. They are marked in the picture below.
Wars Pdl||| Fall NI Aaee 7 Yh, Se resistor
Dev: Production and Sales i Guide by: rama ._ www.castlemaniagames.com < seewood
We are now finished with the top side of the mainboard; turn it bottom side up. Here, 3 resistors have to be desoldered and then the Quick Solder Board (QSB) installed.
Production and Sales ¢.. www.castlemaniagames.com Guide by: = seewood
- Place the QSB on the mainboard as shown, the yellow markings help with the alignment.
Dev: Production and Sales Guide by: fama Be _ www.castiemaniagames.com © seewood
- Connect the 1016 pad from the QSB to the marked location. Please ensure that the cable does not run over the metal areas where the shield could crush it.
YN | | ea ‘es,
It should look like this: = te
{ Production and Sales Guide by: By. www.castlemaniagames.com “© seewood
- The difficult part is now finished, but the lower part of the console shell still needs to be prepared. Clip off the small plastic pin marked below in red. This is necessary to prevent the flex cable from pinching and taking damage during installation.
- Connect the flex cable to the cable holder on the QSB (blue side up) and close the cable holder. When this is done you can fold the flex cable to the right, as shown.
X-Station 100X QSB vi
1016
WW wna 20706 1050 60V 1 A F govt A FIT 14 esa AWM 20706 1056 Fu Sy ew_¥NM 20706 1050 60V ER rail Pe eva. axsnn 20708 1050 600 1 Ba ova Aas 20706 1050 601 F Bawa 20706 1050 600 1 A FT i) wa 20706 1080 60V UR “
Production and Sales i Guide by: ._ www.castlemaniagames.com < seewood
- To ensure that the cable sits correctly route it through the slot on the top shield.
- Prepare the PCB and push all 3 spacers into the xStation board. If you look at it from above they can be found in:
- the lower middle (right next to the ESP32)
- the upper right corner
- the upper left corner. (The spacers are a bit too long for installation in a PU-8. We recommend that you shorten them a bit, so that the xStation pcb rests securely.)
Dev: Production and Sales i < Guide by: fama . WWw.castlemaniagames.com ‘Sys, seewood
- Now grab the other side from the flex cable and carefully connect it to the cable holder on the xStation. When it is done you have to fold the flexcable a bit. Folding it like this is best:
- Mount the xStation on the posts of the original Disc Drive. It should look like this:
When everything is ready, you have to reassemble the Playstation 1 in reverse order.
Dev: Production and Sales i < Guide by: fama . WWw.castlemaniagames.com ‘Sys, seewood
A freshly installed xStation:
Initial Software Steps
- Format a microSD card to either exFAT or FAT32.
- Create a folder on your microSD card named “OOxstation“ (without quotation marks), then download the latest update files and copy the files update.bin and loader.bin to the OOxstation folder. (https://github.com/x-station/xstation-releases) a > OOxstation
Name
| loader.bin
_| update.bin
From now on, your Playstation will boot right into the xStation loader!
Dev: Production and Sales Si Guide by: fama . Www.castlemaniagames.com ‘5:5 seewood